SWAT Literature Database for Peer-Reviewed Journal Articles

Title:Integrating hydrological, landscape ecological, and economic assessment during hydropower exploitation in the Upper Yangtze River 
Authors:Wu, Y., L. Huang, C. Zhao, M. Chen and W. Ouyang 
Year:2021 
Journal:Science of the Total Environment 
Volume (Issue):767 
Pages: 
Article ID:145496 
DOI:10.1016/j.agwat.2021.106766 
URL (non-DOI journals): 
Model:SWAT 
Broad Application Category:hydrologic only 
Primary Application Category:hydropower assessment 
Secondary Application Category:reservoirs, ponds, lakes and/or other impoundment effects  
Watershed Description:495,000 km^2 Jinsha River, the upper reach of the Yangtze River which begins in the Geladandong Snowy Mountains in the Tsinghai–Tibet Plateau and flows through Yunnan–Guizhou Plateau and Sichuan Province in southeast China. 
Calibration Summary: 
Validation Summary: 
General Comments: 
Language:English 
Keywords:Runoff power; Hydroelectric dam; Climate variations; Hydrological process; Landscape ecology; Watershed management